Top brand Construction
Machinery supplier
Guess you like the video
1800TY Aqua-feed Line
Design Flow Chart
Project Machine List
1800T/YEAR AQUA-FEED LINE
Serial Name Model Quantity Power(KW) Note
single total
1、pulverizing process
101 discharging pit、grizzly
1


102 elevator TDTG26/18 1 1.50 1.50 Non-return means four sides engaging process, rigidity
103 pulverizing-pending silo
1



manual plugboard
1


104 screw conveyor TLSS16 1 1.10 1.10 Frequency Control
105 magnetic plate
1

Stainless steel, high magnetic
106 hammer mill SFSP65*38 1 22.0 22.00 Hammer milling, uniform particle size distribution Φ1.2 sieve
107 cyclone Φ650 1


108 air locker GFZ7 1 0.75 0.75
109 high pressure fan 9-26NO4A 1 5.50 5.50
110 simple pulse dust collector
1


111 air locker GFZ5 1 0.55 0.55

subtotal


31.40
2、Mixing process
201 discharging pit、grizzly
1


202 elevator TDTG26/18 1 1.50 1.50 Non-return means four sides engaging process, rigidity
203 mixing-pending silo
1


204 pneumatic valve TZMQ32*2 1


205 mixer SLHY0.4 1 5.5+0.37 5.87 Mechanical equipment through the National Fisheries Quality Supervision and Inspection Center, mixing soft, short, high uniformity. Small electric door
206 small material adding hopper
1


207 penumatic valve TZMQ25×25 1


208 buffer silo
1


209 screw conveyor TLSS16 1 1.10 1.10

subtotal


8.47
3、pelleting process
301 elevator TDTG26/18 1 1.50 1.50 Non-return means four sides engaging process, rigidity
302 magnetic device
1

Stainless steel, high magnetic
303 bilateral screw conveyor TLSS16 1 1.10 1.10
304 pelleting-pending silo
1



manual plugboard
1


305 feed auger SZLH30b2 1 0.55 0.55 Speed Control Feeding
conditioner SZLH30b2 2 2.20 4.40 heat preservation double-jacketed conditioner
pellet mill SZLH30b2 1 22.00 22.00 Gear transmission, low vibration, high transmission efficiency; high yield, produce better quality feed.
306 air-locked feeder
1 0.55 0.55
counter-flow cooler SKL1.5 1 0.75 0.75 Octagonal structure, no dead cooling
307 fan 4-72NO4A 1 5.50 5.50 Gear transmission, low vibration, high transmission efficiency; high yield, produce better quality feed.
308 discharger Φ650 1


309 air locker GFZ.5 1 0.55 0.55

subtotal


36.90
4、packing process of final product
401 elevator TDTG26/18 1 1.50 1.50 Non-return means four sides engaging process, rigidity
402 vibratory screen SFJZ80×1 1 0.2×2 0.40 Without cooler
403 final production silo
2

A material silo, a granule silos, manual packing
404 manual bufferfly valve
3



subtotal


1.90
5、assisting process
501 fan 4-72No4A 1 5.50 5.50
502 pulse jet dust collector TBLMFa.28(1500) 1

Imported electromagnetic valve, 4 cylinder extraction
503 air locker GFZ.5 1 0.55 0.55
504 air compressor
1 7.50 5.50
505 air dryer
1


506 gas tank
1



container rack
1



total


11.55

total


90.22
Electric Control
prices of complete set of aqua-feed equipment
Project Name: 1800t/year aqua-feed line(∮3mm particles 0.8-1.5T / H)
Quote number:
Construction unit:
Serial
Name
Note
1、mechanical equipment (see equipment list)
2、electronic control system
1
centralized control cabinet
2
Cables, wires, trunking, standard tray, and other supporting materials
3
Site control cabinet
3、container unit material
1
Suction, dust removal and cooling ventilation network system
2
Feed pipe, a small rack, platform, pipeline materials and other non-standard items
3
Standard parts, seals, and other solder pieces supporting material
4
Pneumatic components and air compressor accessories
5
Paint (refers to the equipment up painting abroad reassembled)
6
Steam piping system
Steam piping installation drawings and configuration checklist
4, design fees
free
5, container chassis setup fee (refers prefabricated assembly factory in China)
6, foreign on-site guidance of installation and commissioning costs
Foreign engineers to guide installation and commissioning of US $ 80 per day per person
7, unforeseeable expenses
free
8, expedition charges
9, staff training costs
free
Electric Control
Note:
1、packaging and transportation costs are not included in the total price of the equipment
3, site lifting, installation tools and supplies owned by the user
2. This price is valid for MONTHS.
4, all site personnel expenses borne out by the demand side
TOP
×
Login

Not a member yet? Create an account

I'am a supplier Login
×
Register

Already got an account? Login

Become a supplier Register