Top brand Construction
Machinery supplier
Guess you like the video
1800TY Poultry
Design Flow Chart
Project Machine List
No. Name Model Qty. Power(KW)
Unit Total
Ⅰ.Grinding System
101 Screw conveyor
1

102 Bucket elevator TDTG36/18 1 1.10 1.10
103 Pre-grinding bin 1m³ 1

104 Manual plug board
1

105 Screw conveyor TLSS16 1 1.10 1.10
106 Magnet device
1

107 Wide type hammer mill SFSP56*36 1 22.0 22.0
108 Fan 5-36No4.5A 1 5.50 5.50
109 Screw feeder
1

110 Air lock GFZ5 1 0.55 0.55
111 Air lock screw
conveyor
TLSS16 1 1.10 1.10

Ⅱ.Mixing System
201 Feeding inlet,
grizzly

1

202 Bucket elevator TDTG26/18 1 1.10 1.10
204 Pre-mixing bin 1m³ 1

205 Pneumatic slide gate TZMQ32×32 1

206 Ribbon mixer SLHY.0.4 1 5.5+0.37 5.87
207 Additive hopper
1

208 Pneumatic slide gate TZMQ25×25 1

209 Buffer bin
1

210 Screw conveyor TLSS16 1 1.10 1.10

Ⅲ.Pelleting system
301 Bucket elevator TDTG36/23 1 1.50 1.50
302 Magnet device
1


Pneumatic two way valve TLSS16 1 1.10 1.10
304 Pre-pelleting bin 2m³ 1


Manual plug board
1

307 Screw feeder matching with
SZLH30
1 0.55 0.55
Conditioner matching with SZLH30 1 2.20 2.20
Pellet mill SZLH30 1 22.00 22.00
308 Air lock feeder
1 0.55 0.55

Counterflow cooler SKLN1.5 1 0.75 0.75

Fan 4-72NO4A 1 5.50 5.50
309 Discharging device Φ650 1

310 Air lock GFZ.5 1 0.55 0.55
Ⅳ. Products Packing System
401 Bucket elevator TDTG26/18 1 1.10 1.10

vibrating scalper
1 0.2×2 0.40
405 Product bin
2

406 Manual butterfly valve
2


Ⅴ.Auxiliary System
501 Fan 4-72No4A 1 5.50 5.50
502 Pulse dust jet filter TBLMFa.28(1500) 1

503 Air lock GFZ.5 1 0.55 0.55
504 Air compressor
1 7.50 7.50
505 Air dryer
1

507 Air tank
1


  • Grinding System
  • Mixing System
  • Pelleting System
  • Auxiliary System
  • Electronic Control System


Electric Control
Ⅱ.Electronic Control System
1 Centralized control cabinet
2 Cable, wire, trunking,cable tray, and other auxiliary material
Ⅲ.Container type feed integral unit material
1 Air draft, dust removal, cooling ventilation network system.
2 Tube,equipment racks,platforms,noise-reduction tube,piping
materials and non-standard parts.
3 Standard (gb), seals, solder pieces and other auxiliary materials;
4 Paint(Means the painting make-up after reinstalling the equipment)
5 Steam pipeline system
Ⅳ.Design fee For free
Ⅴ.Installation fee(Means prepared assembly in China factory)
Ⅵ.Guiding installation fee in overseas For free
Ⅶ.Unexpected expenses
Ⅷ.Expedition fee For free
Ⅸ.Personal training fee For free
TOP
×
Login

Not a member yet? Create an account

I'am a supplier Login
×
Register

Already got an account? Login

Become a supplier Register