5800 Container Type Feed Integral Unit Equipment List | ||||||
No. | Name | Model | Qty. | Power(KW) | Remarks | |
Unit | Total | |||||
Ⅰ.Grinding System | ||||||
---|---|---|---|---|---|---|
101 |
Feeding inlet, grizzly |
|
1 |
|
|
|
102 | Bucket elevator | TDTG36/18 | 1 | 2.20 | 2.20 | Anti-reversing device, around using the occlusion process, good rigidity |
103 | Pre-grinding bin | 1m³ | 1 |
|
|
|
104 | Feeding cleaning screener | TWCZ18 | 1 | 1.10 | 1.10 | Speed control |
105 | Magnet device | SCGY45 | 1 |
|
|
Made of stainless steel, high and strong magnetism |
106 | Wide type hammer mill | SFSP60*45 | 1 | 45.0 | 45.00 | Hammers type grinding, uniform sized, equipped with Φ2.5 sieve plate |
107 | Fan | 4-72No4A | 1 | 5.50 | 5.50 |
|
108 | Pulse dust jet filter | TBLMFa21(1500) | 1 |
|
|
Novel and efficient dust collector |
109 |
Air lock screw conveyor |
TLSS25 | 1 | 2.20 | 2.20 |
|
|
Subtotal |
|
|
|
56.00 |
|
Ⅱ.Mixing System | ||||||
201 |
Feeding inlet, grizzly |
|
1 |
|
|
|
202 | Bucket elevator | TDTG36/23 | 1 | 2.20 | 2.20 | Anti-reversing device, around using the occlusion process, good rigidity |
203 | Magnet | TCXT20 | 1 |
|
|
|
204 | Pre-mixing bin | 1m³ | 1 |
|
|
|
205 | Pneumatic slide gate | TZMQ40×40 | 1 |
|
|
|
206 | Ribbon mixer | SLHY.1 | 1 | 11.00 | 11.00 | Tested by the national fishery machinery quality supervision and inspection center, gentle mixing process, short period and high mixing evenness. |
207 | Additive hopper |
|
1 |
|
|
|
208 | Pneumatic slide gate | TZMQ25×25 | 1 |
|
|
|
209 | Buffer bin |
|
1 |
|
|
|
210 | Screw conveyor | TLSS25 | 1 | 2.20 | 2.20 |
|
|
Subtotal |
|
|
|
15.40 |
|
Ⅲ.Pelleting system | ||||||
301 | Bucket elevator | TDTG36/23 | 1 | 3.00 | 3.00 | Anti-reversing device, around using the occlusion process, good rigidity |
302 | Magnet device |
|
1 |
|
|
Made of stainless steel, high and strong magnetism |
303 | Pneumatic two way valve | TZMQ2×25/45 | 1 |
|
|
|
304 | Pre-pelleting bin | 2m³ | 1 |
|
|
|
305 | High level indicator |
|
1 |
|
|
|
306 | Low level indicator |
|
1 |
|
|
|
|
Manual plug board |
|
1 |
|
|
|
307 | Screw feeder |
matching with SZLH350 |
1 | 0.55 | 0.55 | Speed control feeding |
Conditioner | matching with SZLH350 | 1 | 2.20 | 2.20 | Specification:Φ280×2000,multi-ponit steam inlet device | |
Pellet mill | SZLH350 | 1 | 55.00 | 55.00 | Gear drive, small vibration, high driving efficiency; high capacity, can better produce high-quality feed. | |
308 | Air lock feeder |
|
1 | 0.55 | 0.55 |
|
|
Counterflow cooler | SKLN2.5 | 1 | 1.50 | 1.50 | Octangle structure, cooling well without dead angle |
309 | Discharging device |
|
1 |
|
|
|
310 | Air lock | GFZ.7 | 1 | 0.75 | 0.75 |
|
311 | Fan | 4-72N05A | 1 | 11.00 | 11.00 |
|
|
Subtotal |
|
|
|
74.55 |
|
Ⅳ. Products Packing System | ||||||
401 | Bucket elevator | TDTG36/18 | 1 | 1.50 | 1.50 | Anti-reversing device, around using the occlusion process, good rigidity |
402 | Crumbler | SSLG15×100 | 1 | 5.50 | 5.50 | Fine serrated crumbling, uniform size |
403 | Rotary sifter | SFJH80×2d | 1 | 1.10 | 1.10 |
|
404 | Pneumatic two way valve | TZMQ2×25/45 | 1 |
|
|
|
405 | Product bin |
|
2 |
|
|
one for powder material bin, one for pellets material bin, manual packing |
406 | Manual butterfly valve |
|
2 |
|
|
|
|
Subtotal |
|
|
|
8.10 |
|
Ⅴ.Auxiliary System | ||||||
501 | Fan | 4-72No4A | 1 | 5.50 | 5.50 |
|
502 | Pulse dust jet filter | TBLMFa.30(1500) | 1 |
|
|
Using imported solenoid valve, remove 4 cylinders. |
503 | Air lock | GFZ.5 | 1 | 0.55 | 0.55 |
|
504 | Air compressor |
|
1 | 7.50 | 7.50 |
|
505 | Air dryer |
|
1 |
|
|
|
507 | Air tank |
|
1 |
|
|
|
|
Container type large frame |
|
1 |
|
|
|
|
Subtotal |
|
|
|
13.55 |
|
|
Total Price |
|
|
|
167.60 |
|
Feed integral unit price list
|
||||||
Project Name:5800 Container Type Feed Integral Unit(∮4mm pellets2-4T/H)
|
||||||
Construction unit:
|
||||||
No.
|
Name
|
Remarks
|
||||
Ⅰ.Machinery (See Equipment List)
|
||||||
Ⅱ.Electronic Control System
|
||||||
1
|
Centralized control cabinet
|
|||||
2
|
Cable, wire, trunking,cable tray, and other auxiliary material
|
|||||
3
|
Site control cabinet
|
|||||
Ⅲ.Container type feed integral unit material
|
||||||
1
|
Air draft, dust removal, cooling ventilation network system.
|
|||||
2
|
Tube,equipment racks,platforms,noise-reduction tube,piping
materials and non-standard parts. |
|||||
3
|
Standard (gb), seals, solder pieces and other auxiliary materials;
|
|||||
4
|
Pneumatic components and compressed air accessories, etc.
|
|||||
5
|
Paint(Means the painting make-up after reinstalling the equipment)
|
|||||
6
|
Steam pipeline system
|
Offer steam installation drawing and configuration list of pipeline.
|
||||
Ⅳ.Design fee
|
For free
|
|||||
Ⅴ.Installation fee(Means prepared assembly in China factory)
|
||||||
Ⅵ.Guiding installation fee in overseas
|
Installation fee in overseas $80/day/person
|
|||||
Ⅶ.Unexpected expenses
|
For free
|
|||||
Ⅷ.Expedition fee
|
||||||
Ⅸ.Personal training fee
|
For free
|
|||||
Electric Control
|
||||||
Notes:
|
1. The packing fee and transportation fee are not included;
|
3.The electrode when installation, oxygen, acetylene and other consumables for buyer's account.
|
||||
|
2. The validity of this quote is in the 2 months.
|
4.Engineers abroad all costs for buyer's account.
|